26th June 2025 Case study: Redwood Bank finalises £3.2m loan for landlord’s... The assets, valued at £4.54 million, include a mix of retail and residential units.
25th June 2025 Case study: CBPF backs Fernham Homes with £38m multi-site credit... The £38m revolving credit facility covers six sites with a GDV of approximately £168m.
25th June 2025 Case study: Alternative Bridging supports York residential project... The transaction was completed in just 12 working days from initial contact.
24th June 2025 Case study: Mera completes £7.5m bridge to support Southeast... The lender refinanced the site, which is strategically located in an area of the Southeast that is experiencing significant regeneration.
23rd June 2025 Case study: Inspired Lending provides £2m loan for Nottingham HMO... The £2m facility covers 100% of both purchase and development costs.
23rd June 2025 Case study: Arc & Co. completes £4.5m loan for Croydon HMO portfolio The two HMO properties, refinanced under residential terms, contain a total of 37 units.
19th June 2025 Case study: Paragon Bank completes £6.97 million loan for... The development includes four two-bedroom bungalows and larger family houses.
18th June 2025 Case study: Arc & Co. and UTB fast-track £770k bridge for Canadian... Potential delays were avoided by bringing in the borrower’s original solicitor, speeding up the completion.
17th June 2025 Case study: Atom bank completes £2.7m loan to support purchase of... The number of HMOs in the UK has dropped by 9.5% since 2018.
13th June 2025 Case study: HTB completes £20m+ development finance facility on... Hampshire Trust Bank (HTB) has announced that it has completed a £20m+ development finance facility to refinance a substantial strategic land portfolio on behalf of a UK-based...